TABLE OF CONTENTS
Chapter 1. Executive Summary
1.1. Market Snapshot
1.2. Key Trends
1.3. Global & Segmental Market Estimates & Forecasts, 2015-2025 (USD Billion)
1.3.1. Data Centre Construction, by Design Type, 2015-2025 (USD Billion)
1.3.2. Data Centre Construction, by Tier Type, 2015-2025 (USD Billion)
1.3.3. Data Centre Construction, by Vertical, 2015-2025 (USD Billion)
1.3.4. Data Centre Construction, by Region, 2015-2025 (USD Billion)
1.4. Estimation Methodology
1.5. Research Assumption
Chapter 2. Data Centre Construction Definition and Scope
2.1. Objective of the Study
2.2. Market Definition & Scope
2.2.1. Industry Evolution
2.2.2. Scope of the Study
2.3. Years Considered for the Study
2.4. Currency Conversion Rates
Chapter 3. Data Centre Construction Dynamics
3.1. See Saw Analysis
3.1.1. Market Drivers
3.1.2. Market Challenges
3.1.3. Market Opportunities
Chapter 4. Data Centre Construction Industry Analysis
4.1. Porter’s 5 Force Model
4.1.1. Bargaining Power of Buyers
4.1.2. Bargaining Power of Suppliers
4.1.3. Threat of New Entrants
4.1.4. Threat of Substitutes
4.1.5. Competitive Rivalry
4.1.6. Futuristic Approach to Porter’s 5 Force Model
4.2. PEST Analysis
4.2.1. Political Scenario
4.2.2. Economic Scenario
4.2.3. Social Scenario
4.2.4. Technological Scenario
4.3. Value Chain Analysis
4.3.1. Supplier
4.3.2. Manufacturers/Service Provider
4.3.3. Distributors
4.3.4. End-Users
4.4. Key Buying Criteria
4.5. Regulatory Framework
4.6. Cost Structure Analysis
4.6.1. Raw Material Cost Analysis
4.6.2. Manufacturing Cost Analysis
4.6.3. Labour Cost Analysis
4.7. Investment Vs Adoption Scenario
4.8. Analyst Recommendation & Conclusion
Chapter 5. Data Centre Construction, by Design Type
5.1. Market Snapshot
5.2. Market Performance – Potential Model
5.3. Key Market Players
5.4. Data Centre Construction, Sub Segment Analysis
5.4.1. Electrical Construction
5.4.1.1. Market estimates & forecasts, 2015-2025 (USD Billion)
5.4.1.2. Regional breakdown estimates & forecasts, 2015-2025 (USD Billion)
5.4.2. Mechanical Construction
5.4.2.1. Market estimates & forecasts, 2015-2025 (USD Billion)
5.4.2.2. Regional breakdown estimates & forecasts, 2015-2025 (USD Billion)
Chapter 6. Data Centre Construction, by Tier Type
6.1. Market Snapshot
6.2. Market Performance – Potential Model
6.3. Key Market Players
6.4. Data Centre Construction, Sub Segment Analysis
6.4.1. Tier1
6.4.1.1. Market estimates & forecasts, 2015-2025 (USD Billion)
6.4.1.2. Regional breakdown estimates & forecasts, 2015-2025 (USD Billion)
6.4.2. Tier2
6.4.2.1. Market estimates & forecasts, 2015-2025 (USD Billion)
6.4.2.2. Regional breakdown estimates & forecasts, 2015-2025 (USD Billion)
6.4.3. Tier3
6.4.3.1. Market estimates & forecasts, 2015-2025 (USD Billion)
6.4.3.2. Regional breakdown estimates & forecasts, 2015-2025 (USD Billion)
6.4.4. Tier4
6.4.4.1. Market estimates & forecasts, 2015-2025 (USD Billion)
6.4.4.2. Regional breakdown estimates & forecasts, 2015-2025 (USD Billion)
Chapter 7. Data Centre Construction, by Vertical
7.1. Market Snapshot
7.2. Market Performance – Potential Model
7.3. Key Market Players
7.4. Data Centre Construction, Sub Segment Analysis
7.4.1. BFSI
7.4.1.1. Market estimates & forecasts, 2015-2025 (USD Billion)
7.4.1.2. Regional breakdown estimates & forecasts, 2015-2025 (USD Billion)
7.4.2. Healthcare
7.4.2.1. Market estimates & forecasts, 2015-2025 (USD Billion)
7.4.2.2. Regional breakdown estimates & forecasts, 2015-2025 (USD Billion)
7.4.3. IT & Telecommunication
7.4.3.1. Market estimates & forecasts, 2015-2025 (USD Billion)
7.4.3.2. Regional breakdown estimates & forecasts, 2015-2025 (USD Billion)
7.4.4. Media & Entertainment
7.4.4.1. Market estimates & forecasts, 2015-2025 (USD Billion)
7.4.4.2. Regional breakdown estimates & forecasts, 2015-2025 (USD Billion)
7.4.5. Oil & Energy
7.4.5.1. Market estimates & forecasts, 2015-2025 (USD Billion)
7.4.5.2. Regional breakdown estimates & forecasts, 2015-2025 (USD Billion)
7.4.6. Public Sector
7.4.6.1. Market estimates & forecasts, 2015-2025 (USD Billion)
7.4.6.2. Regional breakdown estimates & forecasts, 2015-2025 (USD Billion)
Chapter 8. Data Centre Construction, by Regional Analysis
8.1. Data Centre Construction, Regional Market Snapshot (2015-2025)
8.2. North America Data Centre Construction Snapshot
8.2.1. U.S.
8.2.1.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.2.1.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.2.1.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.2.1.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.2.2. Canada
8.2.2.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.2.2.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.2.2.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.2.2.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.3. Europe Data Centre Construction Snapshot
8.3.1. U.K.
8.3.1.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.3.1.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.3.1.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.3.1.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.3.2. Germany
8.3.2.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.3.2.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.3.2.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.3.2.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.3.3. France
8.3.3.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.3.3.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.3.3.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.3.3.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.3.4. Rest of Europe
8.3.4.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.3.4.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.3.4.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.3.4.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.4. Asia Data Centre Construction Snapshot
8.4.1. China
8.4.1.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.4.1.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.4.1.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.4.1.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.4.2. India
8.4.2.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.4.2.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.4.2.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.4.2.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.4.3. Japan
8.4.3.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.4.3.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.4.3.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.4.3.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.4.4. Rest of Asia Pacific
8.4.4.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.4.4.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.4.4.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.4.4.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.5. Latin America Data Centre Construction Snapshot
8.5.1. Brazil
8.5.1.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.5.1.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.5.1.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.5.1.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.5.2. Mexico
8.5.2.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.5.2.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.5.2.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.5.2.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.6. Rest of The World
8.6.1. South America
8.6.1.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.6.1.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.6.1.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.6.1.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.6.2. Middle East and Africa
8.6.2.1. Market estimates & forecasts, 2015-2025 (USD Billion)
8.6.2.2. Components breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.6.2.3. Applications breakdown estimates & forecasts, 2015-2025 (USD Billion)
8.6.2.4. End user breakdown estimates & forecasts, 2015-2025 (USD Billion)
Chapter 9. Competitive Intelligence
9.1. Company Market Share (Subject to Data Availability)
9.2. Top Market Strategies
9.3. Company Profiles
9.3.1. AECOM
9.3.1.1. Overview
9.3.1.2. Financial (Subject to Data Availability)
9.3.1.3. Product Summary
9.3.1.4. Recent Developments
9.3.2. Arup Group
9.3.3. Corgan
9.3.4. DPR Construction
9.3.5. Gensler
9.3.6. HDR
9.3.7. Page Southerland Page
9.3.8. Holder Construction Group
9.3.9. Jones Engineering Group
9.3.10. Structure Tone
9.3.11. Syska Hennssy
9.3.12. Turner Construction
Chapter 10. Research Process
10.1. Research Process
10.1.1. Data Mining
10.1.2. Analysis
10.1.3. Market Estimation
10.1.4. Validation
10.1.5. Publishing
10.1.6. Research Assumption
TABLE 2. LIST OF PRIMARY SOURCES, USED IN THE STUDY OF DATA CENTRE CONSTRUCTION
TABLE 3. DATA CENTRE CONSTRUCTION, REPORT SCOPE
TABLE 4. YEARS CONSIDERED FOR THE STUDY
TABLE 5. EXCHANGE RATES CONSIDERED
TABLE 6. DATA CENTRE CONSTRUCTION ESTIMATES & FORECASTS BY REGION 2015-2025 (USD BILLION)
TABLE 7. DATA CENTRE CONSTRUCTION ESTIMATES & FORECASTS BY COMPONENT 2015-2025 (USD BILLION)
TABLE 8. DATA CENTRE CONSTRUCTION ESTIMATES & FORECASTS BY TYPE 2015-2025 (USD BILLION)
TABLE 9. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 10. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 11. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 12. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 13. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 14. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 15. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 16. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 17. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 18. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 19. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 20. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 21. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 22. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 23. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 24. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 25. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 26. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 27. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 28. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 29. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 30. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 31. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 32. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 33. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 34. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 35. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 36. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 37. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 38. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 39. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 40. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 41. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 42. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 43. DATA CENTRE CONSTRUCTION BY SEGMENT, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 44. DATA CENTRE CONSTRUCTION BY REGION, ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 45. U.S. DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 46. U.S. DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 47. U.S. DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 48. U.S. DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 49. U.S. DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 50. CANADA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 51. CANADA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 52. CANADA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 53. CANADA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 54. CANADA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 55. UK DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 56. UK DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 57. UK DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 58. UK DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 59. UK DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 60. GERMANY DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 61. GERMANY DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 62. GERMANY DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 63. GERMANY DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 64. GERMANY DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 65. ROE DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 66. ROE DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 67. ROE DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 68. ROE DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 69. ROE DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 70. CHINA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 71. CHINA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 72. CHINA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 73. CHINA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 74. CHINA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 75. INDIA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 76. INDIA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 77. INDIA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 78. INDIA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 79. INDIA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 80. JAPAN DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 81. JAPAN DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 82. JAPAN DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 83. JAPAN DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 84. JAPAN DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 85. ROAPAC DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 86. ROAPAC DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 87. ROAPAC DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 88. ROAPAC DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 89. ROAPAC DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 90. BRAZIL DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 91. BRAZIL DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 92. BRAZIL DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 93. BRAZIL DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 94. BRAZIL DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 95. MEXICO DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 96. MEXICO DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 97. MEXICO DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 98. MEXICO DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 99. MEXICO DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 100. ROLA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 101. ROLA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 102. ROLA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 103. ROLA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 104. ROLA DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 105. ROW DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS, 2015-2025 (USD BILLION)
TABLE 106. ROW DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 107. ROW DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 108. ROW DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
TABLE 109. ROW DATA CENTRE CONSTRUCTIONMARKET ESTIMATES & FORECASTS BY SEGMENT 2015-2025 (USD BILLION)
FIG 1. DATA CENTRE CONSTRUCTION, RESEARCH METHODOLOGY
FIG 2. DATA CENTRE CONSTRUCTION, MARKET ESTIMATION TECHNIQUES
FIG 3. GLOBAL MARKET SIZE ESTIMATES & FORECAST METHODS
FIG 4. DATA CENTRE CONSTRUCTION, KEY TRENDS 2016
FIG 5. DATA CENTRE CONSTRUCTION, GROWTH PROSPECTS 2017-2025
FIG 6. DATA CENTRE CONSTRUCTION, PORTERS 5 FORCE MODEL
FIG 7. DATA CENTRE CONSTRUCTION, PEST ANALYSIS
FIG 8. DATA CENTRE CONSTRUCTION, VALUE CHAIN ANALYSIS
FIG 9. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 10. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 11. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 12. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 13. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 14. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 15. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 16. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 17. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 18. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 19. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 20. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 21. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 22. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 23. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 24. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 25. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 26. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 27. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 28. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 29. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 30. DATA CENTRE CONSTRUCTION BY SEGMENT, 2015 & 2025 (USD BILLION)
FIG 31. DATA CENTRE CONSTRUCTION, REGIONAL SNAPSHOT 2015 & 2025
FIG 32. NORTH AMERICA DATA CENTRE CONSTRUCTIONMARKET 2015 & 2025 (USD BILLON)
FIG 33. EUROPE DATA CENTRE CONSTRUCTIONMARKET 2015 & 2025 (USD BILLON)
FIG 34. ASIA PACIFIC DATA CENTRE CONSTRUCTIONMARKET 2015 & 2025 (USD BILLON)
FIG 35. LATIN AMERICA DATA CENTRE CONSTRUCTIONMARKET 2015 & 2025 (USD BILLON)
FIG 36. DATA CENTRE CONSTRUCTION, COMPANY MARKET SHARE ANALYSIS (2016)
【掲載企業】
AECOM、Arup Group、Corgan、DPR Construction、Gensler、HDR、Page Southerland Page、Holder Construction Group、Jones Engineering Group、Structure Tone、Syska Hennssy、Turner Construction